Subtasks
Break a task into smaller steps, give a step to a teammate or the client, and control whether the steps hold the task back.
On this page
Subtasks are the checklist inside a task. Prepare 1040 becomes gather documents, input, review, assemble, deliver.
Where to find it
On the Tasks list, a task opens on its Subtasks tab unless you've starred another tab as your default.
Add a subtask
- Open the task and go to Subtasks.
- Click Add subtask.
- Type the name in the Subtask name… box.
- Press Enter, or click away, to save it. Press Escape to cancel.
Check the box beside a subtask to complete it; check it again to reopen it. Use the arrows to move a subtask up or down.
Who does each step
Each subtask has its own assignee picker. Until you pick someone it shows Same as task with the task assignee's name, because the step follows the task's owner. Pick a teammate to hand that one step to them.
A subtask can also be a client task: the client sees it in their portal and checks it off there. The task must have Visible in client portal turned on first (on its Details tab); until then the switch explains why it's unavailable. A client task can be put on a Remind client schedule, which stops once the client checks it off. When the client completes it, the row reads Done by client with the date.
How subtasks affect the task
Two switches sit at the top of the Subtasks tab, and they belong to this task:
Linear unlock: subtasks unlock in order, so each step is Locked until the one before it is done. Use it where doing step four before step two produces rework.
Require all before complete: while any subtask is still open, moving the task to a Complete status is refused, wherever you change it: the task's own status menu, the Pipeline board, the Tasks list or a bulk Set status. It's refused with This task needs all 3 of its subtasks completed first.
A task can also complete itself when its subtasks are done: when the last open subtask is checked off, whether by someone at your firm or by the client in their portal, the task moves to its pipeline's first Complete status. That comes from the template the task was created from (or the pipeline's setting, if the template defers to it).
If one of your firm's rules stops the move (an open dependency, say), the client's check-off still saves, and the task's Activity notes why it didn't move. See Statuses and pipelines.
If a task won't move to Complete and you can't see why, check Require all before complete on its Subtasks tab. That's the usual answer.
Document requests on a subtask
A template can create a document request whose item is tied to a subtask. While a required document is outstanding, the step reads Waiting on client — required document not received, and checking it off is refused. If the document reached you some other way, Mark complete anyway completes the step. Once the client uploads, the step shows Document uploaded — needs your review so you can accept it right there.
Automations
Subtask completed is one of the events automations can fire on, so a checklist step can trigger something without anyone changing a status. A rule can also check that particular subtasks are all done before it acts. See Build an automation.
Notes and limits
- Subtasks belong to their task and don't appear as separate rows in the task list.
- Subtasks a template creates arrive in the template's order.
